Delivery and installation.
What happens after you approve the quotation: how long it takes, what we need from your site, and what happens when a date has to move.
Where we deliver
Nationwide across the Philippines. Remote, island and hard to access locations are subject to a feasibility check first, and both the charge and the lead time can change with access, transport and site conditions. Where that applies we tell you in the quotation, not afterwards.
Delivery and installation go together
Most Skybass projects are quoted as one service: the system delivered and installed by our own crew. Scheduling starts once the downpayment is confirmed, and the balance is due before installation unless we have agreed something else with you in writing.
Lead time
Estimate 45 to 60 days, depending on the system, how far it is customised, and the site. That is an estimate and not a promise, because these are imported systems and the following can move it:
- Shipping and importation schedules.
- Production and supplier timelines.
- Weather.
- Site readiness and access.
- Changes you ask for after the order is placed.
- Events outside anyone’s control, such as typhoons, calamities or government restrictions.
We tell you when a date moves
If any of that shifts your date, you hear it from us. We would rather give you a date we can hold than the date you want to hear.
What we need from your site
Before the crew arrives:
- Final dimensions confirmed and approved.
- Flooring or mounting surfaces finished and level.
- Power available at the point of installation for a motorised system.
- Clear access for the delivery and installation team.
- You or someone you authorise present on site.
If the site is not ready
We reschedule. Additional charges may apply, and we are not able to carry the delay that follows from it. This is the single most common reason an installation slips, which is why we go through the list with you well before the date.
Rescheduling
One free reschedule per project, subject to availability. Severe weather, calamities and genuinely unforeseen events are handled case by case and we will not penalise you for them.
After the free reschedule, a fee may apply and new dates depend on the schedule. Any such fee is set out on your quotation.
Failed delivery or blocked access
If delivery or installation cannot go ahead because nobody authorised is present, the address or access details were wrong, access is blocked, a building management restriction stops us, or the site does not meet the readiness list, the delivery counts as attempted. Re-delivery is at your cost, and storage may be charged if the items stay undelivered beyond seven days.
Inspection and acceptance
Inspect the work when it is delivered and installed. Raise anything then and there, with us on site, because that is when it is easiest to put right. If nothing is raised at inspection, the work is accepted as complete.
After acceptance we cannot be responsible for damage caused by other trades working on the same site.
Weather and safety
We will postpone a delivery or an installation if the weather or the site makes it unsafe, or risks damaging the system. We would rather lose a day than fix a pergola badly.
Last updated 3 October 2026. Skybass Inc. is a brand of JBC UNLTD CORP, Mezzanine, 322 Sto. Rosario St., Brgy. Plainview, Mandaluyong City. The terms for your own project, including dates, fees and scope, are set out in your written quotation, which takes precedence over this page.
Ask us before you commit.
We would rather answer it now than have you find it out later. Call 0917 800 5500, text the same number, or email sales@skybassinc.com.